In November 2008, due to current economic climate, after the Planning Permission was granted for the project, Client re-applied for the revised scheme suitable for construction in phases.
◊ My involvement: August 2008 – March 2009
◊ The role: Design Architect / Architect Assistant
◊ Phases involved: Design inception, Outline Proposal, Scheme Design, Detail design / Building Regulations, Production Information, Project Planning
◊ Project value: 10.5m
◊ Current status: Planning Permission granted for the overall Scheme. Construction of Block A completed; (Please note that other Architect from the office was appointed to continue with the project after the Planning permission was granted.)
◊ Brief Project Description:
The development to consist of four buildings (Blocks A, B, C and D) and a waste management facility,
with associated site works and landscaping.
One building (Block A) of mixed height of 2 and 3 storeys with roof top screened plant area, all on the North - East side of the site, comprising 1 No. Retail unit with Café of 199.7 sq.m. in total at ground floor and 10 No. own-door office units all under 100 sq.m. gross floor area. Access to be provided from the 2nd floor to part of the roof area.
Three buildings (Blocks B, C and D) of two storeys, comprising 28 No. in total own-door self contained office suites all of under 100 sq.m. gross floor area each.
Permission is requested for building signage as indicated on drawings along with 1 No. site identification sign incorporated into waste management facility building adjacent to the proposed entrance to the site on the North boundary.
| Top of Page | previous | next |